| Recently Completed Projects | | Our portfolio of successful engagement demonstrates our commitment to quality, on- time delivery, technological edge and engineering excellence. Whether it is setting up to diesel generating sets for a riverbed power house or commissioning of power generating sets along the sensitive Indo-Pak border, erecting & commissioning a natural gas compressor package in a flame proof zone or installing the pumping equipment for a water distribution system Efficient Engineers (I) Pvt. Ltd. Is the engineering and consulting company of choice for several prestigious assignments | | | | Supply, Installation, Testing & Commissioning (SITC) of 2 X 1010 KVA, 11KV Diesel Generating Sets for Sardar Sarovar Narmada Nigam Limited. | | The Sardar Sarovar project is a multipurpose river valley project on the river Narmada in Gujarat state. The project envisages construction pf 1210 M long, 12 M high concrete Dame involving placement of about 6 million m3 of pre-cooled concrete. On implementation, the project benefits will include irrigation to 3.5 million hectares of land, power generation of 950 MW at 60 % load factor (installed capacity 1450 MW) and Partial flood control. The project also envisages construction of two power houses- the Riverbed Power houses and Canal Head Power house. The Riverbed power house is an underground powerhouse on the right bank and will comprise of installation of 6 reversible units of 200 MW each .the Canal Head power house is a surface house in a saddle on the right bank at the fringe of the first balancing storage pond and will comprise of installation of 5 Unit of 50 MW each. | | The project awarded to us consist of design, Manufacture, Assembly, Shop testing, Supply, Delivery at Site, Erection, Testing and Commissioning of 2 Stationary type 11 KV Diesel Generating sets each of 1010 KVA capacity at 0.8 power factor for the riverbed as well as the Canal Head power houses. The value of this contract is INR 17.8 Million |
|
| | | | Supply, Installation, Testing & Commissioning (SITC) of 61 x 110 KVA LT Diesel Generating sets of Boarder Security Force. | | When India Decided to commission a flood lighting system and wire fencing across the entire Indo-Pak border from Kashmir to Bhuj and On Indo –Bangladesh Boarder, Efficient Engineers Pvt. Ltd. Was amongst the few qualified Electro Mechanical Contractors across the country. Borders are extremely sensitive areas and in that context, this is one of the most prestigious projects that we feel proud to have worked on. The S.I.T.C. of 61 Nos. of 110 KVA Diesel Generating Sets for providing power to the flood lighting system at Jaisalmer Sector, Rajasthan has recently been completed. The value of this contract is INR 28.4 Million. |
|
| | | | Supply,InstallationTesting & Commissioning (SITC) of Natural Gas Compressor for O.N.G.C.: | | The world has realized the significance of Natural gas which is one of the cleanest and greenest fuels. Power generation using Natural gas is significantly cost effective as compared to conventional fuels. Apart from generation of electricity, usage of gas is also increasing in the domestic , automobile and industrial sectors. Recent discoveries of large reserves of Natural gas have resulted in the emergence of a new market of equipment and technology for Natural gas compression. Being an upcoming market, we sensed the promises and opportunities in this segment and hence started accepting works and projects in this area also. Utilization of Natural gas needs technology based product such as gas compressor along with peripheral equipment like instrumentation, heat exchangers cooling water consoles etc. and the team working on such projects not only needs to be technically stronger, it has to be extremely careful against fires, explosions and other hazards. | | The project awarded to us through international competitive bidding comprises of S.I.T.C. of natural gas compressor package for zero flaring project of oil & Natural gas corporation Ltd. Mehsana. Owing to the hazardous nature of the project, the electrical and other equipment to be utilized has to be flameproof and of higher safety standards. The project involves gas compressor, flame proof motor, control panels with state of the-art instrumentation for maximum automation of plant, air exchanger and cooling water consol etc. erection & commissioning work will be executed in the zero zone i.e. flame proof are a as per D.G.M.S. guidelines. The value of this Contract is INR 20 Million. |
|
| | | | Supply, Installation, Testing & Commissioning (S.I.T.C.) of H.S.C.F. Pump sets for Western AUDA: | | Ahmedabad Urban Development Authority (AUDA) has been playing a significant role in the development of western Ahmedabad. Ahmedabad has recently been awarded the mega city status and considering the available water quality in western parts of Ahmedabad, AUDA embarked upon an ambitious project of supplying and distributing the water of Narmada river to the western part of this mega city. | | The project envisages intake of water from Narmada Canal and Filtering it at Jaspur plant before distributing it to various regions. This distribution needs huge pumping machinery at several pumping stations and Efficient Engineers (I) Pvt. Ltd. Was once again the preferred Electro- Mechanical contractor For this project | | The project awarded to us Comprises of S.I.T.C of H.S.C.F. Pump set for jodhpur EM-02, Ranip EM-04, Bodakdev EM-05, Chandkheda EM-08 Kali EM-09, Gota EM-11and ADB AUDA (Bodakdev, Sola, Thaltej,Ambli & Jodhpur) pumping stations. The value of this Contract is INR 61.7 Million. |
|
| | |
| |
No comments:
Post a Comment