tracker

TQMC

TQMC has acquired wide Domain Knowledge and Experience. You can FREELY access it here and here

DISCLAIMER: This matter here is a guide only. For authentic and up-to-date information, please contact TQMC.

The DIRECTIVES and STANDARDS listed here may have been subsequently REVISED . You must refer to the CURRENT REVISION and AMENDMENTS if any.

Friday, October 31, 2008

WRLDC

MoP committee report on manpower certification and incentives
CERC Order-in-petition No. 147-2007
Procedure for collective transactions with 4 Annexures
Indian Electricity Grid Code (IEGC)

Recovery Procedures
Operating Procedures
Significance Of UI Mechanism In Indian Electric Supply Industry
A Novel Settlement / Arbitrage Scheme - Use Of Asynchronous Inter-Regional Links In India
Visualization And Human Factors In Electric Power System Operation
MPSEB Petition
ABT in WR
A Poetry On UI


more

Power map of Maharashtra

1 comment:

  1. Now ALEC had decided tо appease tɦe climate change deniers
    аnd go afteг renewable energy. Ҭhe motion of
    a vertical wind turbine іs mesmerizing in the same աay ɑs
    waves on the beach or a campfire. -- Blue-collar workers mаy want to trade for "green-collar" jobs.
    So what to do next, Ԁo we ɦave options.


    Ηere is my site: cost of solar panels (Futuresgreenenergy.com)

    ReplyDelete