Salient requirements from Grid Code:



EMERGENCY State defined
Loss of generation
Breakdown of transmission lines affecting the system
Grid disturbances
System isolation


Isolate and Connection Facilities
- pg 33 of Grid Code



MIS
Reportable Events
- pg 47 of Grid Code

Transmission Assets Statement
By Sept 30 Annually

SERVICE SPECS for Control Room
Fault clearance time
100 ms for 800 kV class and 400 kV
-pg 31 Grid Code