Functions of WRPC...

1
To facilitate the stability and smooth operation of the integrated grid and economy & efficiency in the operation of power system in the region, the following are the functions of WRPC:


To undertake Regional Level operation analysis for improving grid performance.


To facilitate inter-state/inter-regional transfer of power.


To facilitate all functions of planning relating to inter-state/ intra-state transmission system with CTU / STU.


To coordinate planning of maintenance of generating machines of various generating companies of the region including those of inter-state generating companies supplying electricity to the Region on annual basis and also to undertake review of maintenance programme on monthly basis.


To undertake planning of outage of transmission system on monthly basis.


To undertake operational planning studies including protection studies for stable operation of the grid.


To undertake planning for maintaining proper voltages through review of reactive compensation requirement through system study committee and monitoring of installed capacitors.


To evolve consensus on all issues relating to economy and efficiency in the operation of power system in the region.
2
The decision of WRPC arrived at by consensus regarding operation of the Western Regional Grid and scheduling and dispatch of electricity will be followed by WRLDC subject to directions of the Central Commission, if any.
3
In addition to the above, the CERC has entrusted the following functions to Member Secretary, WRPC/WRPC Secretariat under IEGC /various Regulations:
Preparation of Regional Energy Accounts.
Preparation of Weekly UI & Reactive Energy Accounts.


For the purpose of payment of transmission charges/capacity charges and incentive, certify:


(a)
Availability of Regional AC and HVDC transmission system.


(b)
Availability and PLF for ISGS (Thermal).


(c)
Capacity index for ISGS (Hydro).

To resolve the grievances in matter related to Open Access in inter-state transmission.

Periodic inspection of under frequency relays.

Preparation and review of Annual Outage plans of generation.