EMERGENCY State defined
Loss of generation
Breakdown of transmission lines affecting the system
Grid disturbances
System isolation
Isolate and Connection Facilities
- pg 33 of Grid Code
MIS
Reportable Events
- pg 47 of Grid Code
Transmission Assets Statement
By Sept 30 Annually
SERVICE SPECS for Control Room
Fault clearance time
100 ms for 800 kV class and 400 kV
-pg 31 Grid Code
ISO 9001:2008 is no more just QMS, it is now a Business Management System that requires you to do RISK Management when designing the QMS. You have to understand the Risks to the business, and determine the Processes to be develoed. This may require you to do HACCP studies, if you are a food processor, and understand Product liability and the implications of Product Recall as in ISO/PC 240. For guidance in designing your QMS, you must refer to ISO 9004:2009.